Path based priority rule for resource constrained project scheduling problems


Thesis Type: Postgraduate

Institution Of The Thesis: Marmara University, Faculty of Engineering, Industrial Engineering, Turkey

Approval Date: 2006

Thesis Language: English

Student: GÜLTEKİN HARUN SEÇKİN

Supervisor: SEROL BULKAN